The Factory-School: A 30,670 m² Talent Engine Blueprint

The Factory-School: A 30,670 m² Talent Engine Blueprint

The Everest Group’s design of the 30,670 m² Factory-School for UNAQ crossed a threshold in 2009, transforming human capital from a chronic bottleneck into a strategic, bankable asset for Mexico’s aerospace cluster. Before this intervention, the promise of nearshoring for advanced manufacturing was perpetually capped by a severe deficit of certified, floor-ready engineers. The industryRead more ⟶